jump to content immediately

Gateway Greenspace Ready for Brick Installation

Greenspace1209-2

Streetscape work continues along Washington Street East and around the corner towards Leon Sullivan Way.  The sidewalk area is now prepared and ready for cement and brick installation.

Photos and comments by Susie Salisbury

Greenspace1209-1

Your Reply:


required


required (won't be showed)



You can use these tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Trackback this Article  |  Subsribe to Comments