jump to content immediately

Greenspace Moves Ahead with Streetscape & Top Soil

GreenspaceDec09-1

Order’s Construction continues to work on the Washington Street East streetscape portion of the project, including sidewalks, granite curbing and brick accents.  The contractor is also installing top soil this week along back areas of the stepped walls.

Comments and photos by Susie Salisbury

GreenspaceDec09-2

Your Reply:


required


required (won't be showed)



You can use these tags:
<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

Trackback this Article  |  Subsribe to Comments